After a year of dead wood clearing, I had two ginormous brush piles.

One near the road (but hidden), the second in the woods near the dining room.

Raymond started bright and early. He had half of the front pile loaded in this pic.
My job was to bring the second pile up to the road.
The pic below shows about 1/10th of the second pile.

 

First load ready for tie down and take to the dump

It took nine hours over two days to haul out all the brush
Compare this picture below to the first one with Raymond

Last Load

There is a pile of limbs by the driveway waiting for chipping.
The pile is about 6ft high and 20ft long.
We’ll get to that the last week in October